CasewareDocs
New in Caseware Cloud EngagementsSee what's new

520 To 550

  1. Enter an RMM (assertion level) in Part B of checklist 520.

  2. Open checklist 550 and right-click on a blank Description of risk. You will be presented with all the risks entered in part B of checklist 520.

  3. Values populate from checklist 520 as follows:

550 Specific features

The Preventative vs. Detective column is automatically set based on what is set in the Type(s) column. This can be changed by clicking on the dropdown in Preventative vs. Detective column.

The original checklist 550 as provided by CPA Canada was very long horizontally with many columns. The Jazzit version has the right side of the table split onto the bottom half of the document for easier readability.